How Much Did It Cost to Build Hayward Field- A Breakdown of the Construction Expenses

How much did it cost to build Hayward Field? This question often arises among sports enthusiasts and historians alike, as Hayward Field holds a significant place in the history of track and field. Constructed in 1919, the iconic stadium has been the home of the University of Oregon’s track and field team, as well as hosting numerous national and international competitions over the years. In this article, we will delve into the cost of building Hayward Field and explore the factors that contributed to its construction expenses.

The initial cost of building Hayward Field was approximately $150,000, which, when adjusted for inflation, would be equivalent to around $2.3 million today. This figure, however, does not include the subsequent renovations and upgrades that have been made over the years. The construction of the stadium was a collaborative effort between the University of Oregon and the city of Eugene, with both parties contributing to the funding.

One of the primary reasons for the relatively high cost of building Hayward Field was the unique design and materials used. The stadium was designed by the renowned architect John Van Pelt, who sought to create a facility that would not only serve as a home for the university’s track and field team but also serve as a community gathering place. To achieve this, Van Pelt chose to use a combination of local materials, such as basalt and Oregon pine, which were both abundant and durable.

Another factor that contributed to the construction costs was the extensive landscaping and infrastructure required to support the stadium. The stadium was built on a hillside, which necessitated the construction of retaining walls and extensive grading work. Additionally, the stadium was equipped with state-of-the-art facilities for athletes and spectators, including locker rooms, restrooms, and concessions.

Over the years, Hayward Field has undergone several renovations and upgrades to keep it competitive with other top-tier track and field facilities. In 1939, the stadium was expanded to accommodate more spectators, and in the 1950s, it was renamed in honor of Hayward Field’s first coach, Bill Bowerman. In the 1990s, the facility was further upgraded to meet the demands of international competition, including the 2000 NCAA Outdoor Track and Field Championships.

The cost of these renovations and upgrades varied, with estimates ranging from $1 million to $5 million. The most significant renovation took place in 2011, when the facility was completely rebuilt, with a new track, seating, and infrastructure. The total cost of this renovation was approximately $200 million, making it one of the most expensive sports facility renovations in the United States.

In conclusion, the cost of building Hayward Field was significant, with the initial construction costing approximately $150,000. The unique design, materials, and infrastructure required for the stadium contributed to its high cost. Over the years, Hayward Field has been a testament to the dedication and commitment of the University of Oregon and the city of Eugene to the sport of track and field. Despite the high costs, the stadium has remained a beacon of excellence in the world of athletics, and its legacy continues to inspire future generations of athletes and fans.